**Minimum order of 5 m³**
One part cement, three parts sand, and six parts gravel.
Save time on all types of projects because there is no need to mix the concrete yourself. Your team can work on other tasks while waiting for your concrete to be delivered.
1:3:6 Wet Mix Concrete
The dry volume of a concrete mixture is always greater than the wet volume by approximately 54%.
So, to produce one load or 5 cubic meters of wet concrete, 7.7 cubic meters of dry materials (cement, sand, and gravel) are required.
* Cement — 0.77 m³ or 27.72 sacks @Php260 each (Php 7,207)
* Sand — 2.31 m³ @Php 2,000 per m³ (Php 4,620)
* Gravel — 4.4 m³ @Php 2,200 per m³ (Php 10,164)
* Mixing — 7.7 m³ @Php 2,000 per m³ (Php 15,400)
* Total: Php 7,478 per m³ (@Php 37,391 per minimum order of 5 m³)
Note: Minimum order of 5 m³
For orders placed from 8AM to 11AM, we will deliver your order before 5PM on the same day. Orders beyond those hours will be delivered before 12NN the following day. Timings might change depending on the availability of supplies. We will notify you in advance regarding this.