**Minimum order of 5 m³**
One part cement, two parts sand, and four parts gravel.
Finish your project faster and save money with our ready-mix concrete! Wet mix concrete is prepared off-site and is ready for immediate use, minimizing the time required to set up and mix materials on-site.
1:2:4 Wet Mix Concrete
The dry volume of a concrete mixture is always greater than the wet volume by approximately 54%.
So, to produce one load or 5 cubic meters of wet concrete, 7.7 cubic meters of dry materials (cement, sand, and gravel) are required.
* Cement — 1.1 m³ or 39.6 sacks @Php260 each (Php 10,296)
* Sand — 2.2 m³ @Php 2,000 per m³ (Php 4,400)
* Gravel — 4.4 m³ @Php 2,200 per m³ (Php 9,680)
* Mixing — 7.7 m³ @Php 2,000 per m³ (Php 15,400)
* Total: Php 7,955 per m³ (@Php 39,776 per minimum order of 5 m³)
Note: Minimum order of 5 m³
For orders placed from 8AM to 11AM, we will deliver your order before 5PM on the same day. Orders beyond those hours will be delivered before 12NN the following day. Timings might change depending on the availability of supplies. We will notify you in advance regarding this.