**Minimum order of 5 m³**

One part cement, two parts sand, and three parts gravel.

 

Ready-mix concrete eliminates the need for on-site mixing equipment and labor, significantly reducing the time required for concrete placement!

1:2:3 Wet Mix Concrete

₱8,203.00Price
Quantity
  • The dry volume of a concrete mixture is always greater than the wet volume by approximately 54%.

    So, to produce one load or 5 cubic meters of wet concrete, 7.7 cubic meters of dry materials (cement, sand, and gravel) are required.

     

    * Cement — 1.28 m³ or 46.2 sacks @Php260 each (Php 12,012)

    * Sand — 2.57 m³ @Php 2,000 per m³ (Php 5,133)

    * Gravel — 3.85 m³ @Php 2,200 per m³ (Php 8,470)

    * Mixing — 7.7 m³ @Php 2,000 per m³ (Php 15,400)

    * Total: Php 8,203 per m³ (@Php 41,015.33 per minimum order of 5 m³)

  • Note: Minimum order of 5 m³

     

    For orders placed from 8AM to 11AM, we will deliver your order before 5PM on the same day. Orders beyond those hours will be delivered before 12NN the following day. Timings might change depending on the availability of supplies. We will notify you in advance regarding this.